Background map: bare-earth lidar of the drainage near US 101 west of Port Angeles, with the parcels of the reach outlined and owners not named, the route north to Dry Creek and the route west toward the Elwha, the US 101 culvert rated 0% passable, the Edgewood culvert, the Dry Creek falls (a WDFW-verified total barrier), and the bluff drop on the western route.

Critical Areas · Updated November 9, 2026

Updated Critical Areas:Where We're At Now

Why this page exists: Clallam County is proposing to expand its critical areas, with wider stream buffers and more land under review, before it has resolved the critical areas it already has. This page shows that through one real local case, a small drainage on US 101 that the County's own records type three different ways and that the County and DNR each say is not theirs to correct. Third Harvest's position is that existing designations should be resolved first, before any expansion. Start with the local case.

Neighbors Have Joined the Fight. Awareness Is Growing.

Five neighbors and seven parcels along one small drainage near US 101, roughly 50 acres in all, are now asking Clallam County for remedy and clarification. Here is the record, the work in progress, and what the November 10 hearing is for.

The maps, full screen

Bare-earth lidar map of the drainage near US 101 with the reach's parcels outlined (owners not named), both recorded routes, the US 101 culvert rated 0% passable, the Edgewood culvert, the Dry Creek falls total barrier, and the western route's bluff drop.
Bare-earth lidar: WA DNR Lidar Portal, Olympics North OPSW 2018 DTM (3 ft). Parcels outlined, owners not named (Clallam County GIS). Routes: USGS, DNR, Clallam County. Barriers: WDFW; western route per a 2000 DNR water type form, not field-verified above Laird Rd. Not a survey.
ShareXFacebook

Running statusUpdated November 19, 2026

Updated November 19, 2026

A running log of the County process, newest first. Facts are linked to the public record. Positions are labeled as Third Harvest's.

George Peterson of Third Harvest sent a letter to the Clallam County Planning Commission, for the record of the Chapter 27.12 update, in response to the November 18 work session. The letter was sent on the morning of November 19. It restates the five questions delivered during public comment the night before and asks that each be answered in writing.

A public version of that letter, with the phone number and email address omitted, is posted below, along with the four attachments. See Letter to the Planning Commission. The County's Planning Commission roster and the official comment route are in Who is making decisions.

On Wednesday, November 18, 2026, at 6 p.m., the Clallam County Planning Commission held a work session at the courthouse, Room 160, and by Zoom, to review proposed changes to the Critical Areas Ordinance, Chapter 27.12. The posted agenda listed that review as a work-session item. It listed no public hearing and no commission action.

George Peterson of Third Harvest delivered this statement and five questions during public comment.

“The County is about to rewrite Chapter 27.12 on top of a DNR water type map it already knows is wrong. Mapping errors and County administrative errors are documented on the record, and none have been corrected. Even so, this draft widens Type F buffers without a single field visit, and it brushes aside field studies landowners paid for. It collapses five water types into three and offers no real way to fix a mistake. The result is private land taken out of use on the strength of a map the County cannot defend, with no remedy for the owner. Do not advance this draft until these five questions are answered in writing for the record:

  1. Who is writing this ordinance? Name every staff member, consultant, agency, and outside group that drafted or reviewed the language.
  2. Knowing the DNR layer has documented errors, why is the County adopting it as the basis for buffers? Who at the County accepts responsibility for buffers placed on the wrong ground?
  3. How many parcels gain new or larger Type F buffers under this draft without any field verification? Has staff counted them?
  4. When a landowner's field study shows the map is wrong, what in this draft requires the County to accept that study? Who has final authority, and who pays?
  5. In going from five water types to three, what protections or distinctions are lost? Has staff analyzed the cost to landowners and the loss of usable or taxable land?
George Peterson, Third Harvest, Planning Commission work session, November 18, 2026

According to George Peterson's account, after the questions were delivered, the Planning Commission directed the County's senior planner to answer each question. Written answers are awaited. This page will be updated when the County's minutes or recording are posted. Official minutes and a recording had not been posted when this was published.

November 18, 2026

The Board of County Commissioners canceled its regular meeting on Tuesday, November 17. The County's public calendar lists that meeting as cancelled. The agenda posted for it is a header only and does not list a comprehensive plan or critical areas item. The Board's November 16 work session agenda shows the commissioners at a Washington State Association of Counties conference on November 17–19, and it moved Tuesday's action items to Monday. That Monday agenda also has no comprehensive plan or critical areas item.

The comprehensive plan is on a different calendar. On November 10, the Board opened a continued public hearing on an ordinance and resolution regarding the Clallam County Comprehensive Plan, took public testimony, and voted to continue that hearing to Tuesday, December 8, 2026, at 10:30 a.m. The County's official hearing list describes December 8 as a continued hearing on a resolution and ordinance amending Title 31, the Comprehensive Plan, and Title 33, Zoning. It does not list a hearing that day on the Chapter 27.12 critical areas ordinance. Radio Pacific reported that commissioners expect to take up revisions at their November 23 work session and could adopt the plan on December 8 if the revised draft is ready. As of today, the November 23 work session and the December 8 Board meeting are on the calendar. The County has not yet posted an agenda packet for either date, and the updated comprehensive plan draft is still marked “will be linked once available.”

The critical areas ordinance is still before the Planning Commission. The Commission's agenda for tonight, Wednesday, November 18, at 6 p.m., lists a work-session review of proposed changes to the Critical Areas Ordinance. It lists no public hearing and no commission action on that ordinance. The Commission's next regular meetings are December 2 and December 16 at 6 p.m. As of today, no agenda has been posted for either of those later dates, and the County's hearing list does not advertise a public hearing on Chapter 27.12.

Third Harvest's view is that the comprehensive plan process appears to be marching toward a predetermined adoption on December 8. That is our reading of the pace and the sequencing, not a finding in the County record. The Predetermination section of this page sets out why we have reached that view.

How the County is administering critical areas

The same day, Third Harvest sent a letter to Clallam County's Department of Community Development director on the water type and crossing at 243043 Highway 101 and 208 Laird Road. What follows is a short account of the administrative points in that letter. These are Third Harvest's documented positions, not County findings.

Third Harvest's November 18 letter to the DCD director documents about a year and a half of mostly verbal interactions with the County, followed by a written record in which County staff have given different answers over time. One written reply required a signed landowner affidavit and said approval of a variance was not likely. Later written replies said the County has no mechanism to modify stream types. After a water type modification was filed with DNR following County direction, DNR replied that it does not have jurisdiction on non-forestland water type modifications. The letter also concludes that there is no County form a property owner can file when they believe a water type on non-forestland is incorrect, and that such a correction has to be initiated by the County.

The letter documents that Third Harvest was asked for a letter from the current owner authorizing the request. Third Harvest's position, as set out in the letter, is that CCC 27.12.700(1) already allows a contract purchaser to apply, so that additional authorization is not required by the code.

The letter documents that the County maps the reach as Type 3, fish-bearing, and that under CCC 27.12.900(84)(c) the Type 3 presumption for resident game fish requires a channel 10 feet or wider. Third Harvest's letter states that 2018 County records at nearby sites showed average widths of about 4 and 6 feet, short of that 10-foot test, and that those sites are not this crossing. It also states that, at this site, the DNR forest practices water type layer does not overlay the actual channel, so a width determination based on that layer is unreliable.

The letter documents that DNR calls its water type maps a starting point, not a determination, and that WAC 365-190-130 tells counties not to rely solely on them. Third Harvest's position, as set out in the letter, is that the County is deferring to DNR to change a water type layer the County can correct itself under CCC 27.12.050, which provides that the County's maps “shall be advisory” and that critical areas shall not include lands where a qualified professional or qualified professional sources demonstrate that the maps are in error.

November 19, 2026

George Peterson's response to the November 18 work session on draft Chapter 27.12, sent to the Commission the next morning.

On the morning of November 19, 2026, George Peterson of Third Harvest sent a letter to the Clallam County Planning Commission, for the record of the Chapter 27.12 update, in response to the Commission's November 18 work session. The letter asks that the five questions delivered during public comment the night before be answered in writing. What follows is a short account of the letter, using its wording on the points below. These are Third Harvest's positions, not County findings. A public version of the letter, with the phone number and email address omitted, is available to download.

Download the public letter (PDF)

The 39-parcel reach

The letter states: “In this reach alone, from Highway 101 down through Edgewood Drive to the Dry Creek falls, the County's mapping puts 39 parcels under a Type 3, fish-bearing critical-areas label. The attached maps show this reach, the parcels and owners affected, and the downstream total blockages.” The attached maps note that owner names are omitted.

Dry Creek falls and the western lake outlet

The letter states: “The Dry Creek outlet is well documented as a total natural barrier to salmon and steelhead coming up from the Strait: the WRIA 18 plan says Dry Creek has ‘an impassable 20-foot bedrock falls/cascade,’ impassable for anadromous fish, and WDFW site 931064 is a 6-meter bedrock falls with ‘Blockage: Total.’ As I understand it, the western lake outlet is likewise a total natural blockage to anadromous salmonids.”

The October 19 WDFW reply

The letter states: “The Washington Department of Fish and Wildlife wrote on October 19, 2026, ‘I look forward to reviewing your HPA application once it is submitted.’ That permit question arises only because of the County's disputed typing of this reach. It is separate from an existing matter about the ford and crossing at that location, which long predates critical areas coming into review on this reach.”

The five questions, as restated in the letter

The letter restates the five questions of November 18 and asks that each be answered in writing:

  1. Who is writing this ordinance? Name every staff member, consultant, agency, and outside group that drafted or reviewed the language.
  2. Knowing the DNR layer has documented errors, why is the County adopting it as the basis for buffers? Who at the County accepts responsibility for buffers placed on the wrong ground?
  3. How many parcels gain new or larger Type F buffers under this draft without any field verification? Has staff consulted them?
  4. When a landowner's field study shows the map is wrong, what in this draft requires the County to accept that study? Who has final authority, and who pays?
  5. In going from five water types to three, what protections or distinctions are lost? Has staff analyzed the cost to landowners and the loss of usable or taxable land?

Attachments

Clallam County

The Planning Commission recommends code changes to the Board of County Commissioners. The public may attend its meetings and submit comments.

The Clallam County Planning Commission is a nine-member volunteer advisory panel. It makes recommendations to the Board of County Commissioners on land use planning and regulatory issues, including code changes such as the draft of Chapter 27.12, the Critical Areas Ordinance. Members are appointed by the Board for staggered four-year terms. Each commissioner district is represented by three members.

The County's official roster, as of this writing, lists the following members. One District 1 seat is listed as vacant.

Elected officers

  • Steve GaleChair, District 1
  • Katina HesterVice-Chair, District 2

Members

  • Steve GaleDistrict 1
  • Ronald LongDistrict 1
  • Katina HesterDistrict 2
  • Thomas ButlerDistrict 2
  • Warren BillupsDistrict 2
  • Jane HielmanDistrict 3
  • Janice WilsonDistrict 3
  • Kenneth ReandeauDistrict 3
  • VacantDistrict 1

Regular meetings are on the first and third Wednesday of each month at 6 p.m., at the Clallam County Courthouse and/or by Zoom, as listed on the meeting agenda. Meetings are open to the public. The County's How Do I Provide Input? page explains that a brief public comment period is generally provided at regular meetings, and that written comments or questions can be submitted through the County's Contact the Planning Commission form. Comments may also be sent to the Planning Division at DCDplan@clallamcountywa.gov, the address listed on the County's Planning Division page.

Showing: “Government gone wild”: the local case

The core case · Start here

One small drainage on US 101. The County's own records still disagree on what it is, and neither the County nor DNR has claimed the decision to correct the map, while the County proposes wider buffers on top of it.

The parcel is 243043 Highway 101 (Clallam County parcel 073014-110050, 2.27 acres in County GIS), held by Third Harvest under a purchase-and-sale agreement. A farm crossing has served this land for generations. Five neighbors along the same reach are now joining Third Harvest in asking the County for remedy and clarification: together, seven parcels and roughly 50 acres. We do not name the neighbors here.

Update · November 29, 2026

Seven weeks of letters with Clallam County DCD, and still no written determination on the crossing or the water type. Here is the record, in full.

The County's own records labeled land on this reach a critical area. A subdivision and a driveway were approved anyway.

On August 27, 1997, Bruce W. Emery, now the DCD Director, signed the plat for the large lot subdivision just north of us (LDV97-00002) as Administrator. That plat designates a Class III and Class IV wetland and a wetland buffer under the County's critical areas code, CCC 27.12. The County approved the subdivision, then issued a multiple-lot driveway permit, RDP98-00153, on April 8, 1998. That lane now crosses the same County-mapped stream about 946 feet north of the 243043 crossing.

Their crossing: after development

On the neighboring subdivision, no lane or crossing appears in any dated image through the September 21, 1994 USGS aerial. It first appears in the County's 2000 aerial, after the 1997 and 1998 approvals.

Our crossing: before 1992

Director Emery's own November 25 letter says the aerial history “does indicate some active crossing of the stream may have existed prior to the 1992 CAO.” The evidence in the County's file includes the 1939 aerial, the 1955 and 1978 USGS maps showing a road running beside this drainage at the parcel, and lidar from 2001.

Both crossings are on the same County-mapped stream. The older one is still waiting for a written determination. Read the November 25 letter or see the subdivision's permit record in the last tab.

  1. October 7 to 9

    After a site meeting, a DCD planner sent DNR's non-forestland water type form. George Peterson asked in writing for a determination that the crossing is a lawful pre-existing use. The County replied that it needed proof the crossing existed before 1992, and that “the approval of a variance is not likely.”

  2. November 13

    DCD Director Bruce Emery wrote that no official determination could be made without the owner's written consent, and that “we are not able to authorize use of the crossing as pre-existing or otherwise.”

  3. November 18

    George Peterson sent the owner's written authorization and the evidence again, and asked for two written determinations: the water type for this reach, and that the existing at-grade ford crossing is a lawful pre-existing use. He also asked which email thread the County wants used.

  4. November 25

    Director Emery accepted the owner's authorization. He wrote that the aerial history “does indicate some active crossing of the stream may have existed prior to the 1992 CAO,” but that the aerial series show “no access activity from the 1994 Aerial Series through the 2011 Aerial Series, a time span of at least 17 years,” and that without other evidence “we will be unable to reach that conclusion.” He cited the abandonment language in CCC 27.12.025(8) and CCC 27.12.040, said the County has no process of its own for stream typing, and said a new culvert or bridge would need a variance, a mitigation plan and a state Hydraulic Project Approval.

  5. November 29 · Reply in preparation

    George Peterson's reply is being prepared and has not been sent as of this update. It asks for specific, written determinations: whether the County finds that the crossing existed before the 1992 ordinance; whether the County is making a formal finding of abandonment under CCC 27.12.025(8) or only saying it may have been abandoned; and which parts of the November 25 letter, if any, are appealable decisions. It will be posted here once it is sent.

What is still open

  • “May have existed” is not a finding either way. No written determination on the crossing or the water type has been issued.
  • The November 25 letter does not say whether it is a final decision, and it gives no findings or appeal instructions. County code sets short windows to ask for reconsideration or to appeal decisions (Chapter 26.10 CCC). Third Harvest has asked the County to say which, if any, of its statements are appealable.
  • The November 18 question about which email thread to use has not been answered.

This is Third Harvest's account of the record. It is not legal advice.

  1. 1One drainage, three classifications

    The County's own records type this drainage three ways: Type 3 on the County critical areas map; Type 4/5 in the County's 2014 written determination for the reach just upstream; and Type F in DNR's 2014 forest practices file. In 2014 the County wrote: “Clallam County has determined that this is a Type 4/5 stream as allowed per Section 27.12.050 CCC.” The County has not reconciled that determination with the Type 3 it applies here.

    Sources: Clallam County critical areas map; FPA 2014-00005, Revised Conversion Option Harvest Plan, 2014 (DNR file fp2613270, PDF); DNR 2014 forest practices file.

    See what the records show ↓

  2. 2The County has corrected this kind of map error before

    County staff wrote in 2014 that “Clallam County will regulate this stream as a type 4/5.” A 2025 Hearing Examiner decision records that “It was determined by DCD staff that the Clallam County Critical Area map is in error with regards to the stream type.” Those were findings for individual permits, not map amendments. County code says map information “shall be advisory” and gives the Administrator a way to correct a map shown to be in error.

    Sources: FPA 2014-00004, December 16, 2014 (DNR file fp2613374, PDF); Clallam County Hearing Examiner, PVAR2024-00011, Revised Decision, March 24, 2025 (County document 22034, PDF); CCC 27.12.050.

    See where the case stands ↓

  3. 3The referral loop: the County points to DNR, DNR says it is not theirs

    The County wrote on October 15, 2026: “The County has no mechanism to modify stream types,” and referred the question to DNR. DNR Forest Practices replied in writing on October 20, 2026 that it “does not have jurisdiction on non-forestland water type modifications,” and that its own hydro layer “appears to mis-map the segment of interest.” Third Harvest filed the application the County asked for anyway, on October 20, 2026. In writing, neither agency has claimed the decision.

    Sources: Clallam County DCD, emails of October 9 and October 15, 2026; DNR Forest Practices, Olympic Region, written replies to Third Harvest, October 20, 2026.

    See the referral loop ↓

  4. 4The only fieldwork on record found no fish

    In 2004 a WDFW crew rated the US 101 culvert on this drainage a total barrier to fish, 0% passable. The downstream survey walked about 656 ft past the crossing and recorded no fish of any species. That is the only fieldwork on record for this channel; the roughly 0.9 mile from there to W Edgewood Drive has never been surveyed or typed in the field. WDFW's October 19 reply, and Third Harvest's response, are set out in full below.

    Source: WDFW Fish Passage and Diversion Screening Inventory, site 995540 (2004 assessment and habitat survey).

    See the 2004 survey ↓

  5. 5Meanwhile, the draft expands critical areas

    The October 13, 2026 draft of Chapter 27.12, not yet adopted, would replace the County's five water types with DNR's three (F, Np and Ns) and set stream buffers of 150 feet for fish-bearing (Type F) streams and 100 feet for Np and Ns. On this 2.27-acre parcel, the buffer along the County's mapped line covers about 0.82 acre (36%) at today's 60 feet, and about 1.70 acres (75%) at 150 feet.

    Sources: October 13, 2026 draft of Chapter 27.12, 27.12.310(1)(a), p. 34, and 27.12.315, p. 36; current CCC 27.12.315; acreage is a GIS estimate from Clallam County layers, not a survey.

    See what owners lose ↓

  6. 6The cost of proof lands on the owner

    The draft's written path out of a fish-bearing presumption is proof “using methods described in Forest Practices Board Manual Section 23,” work the owner pays for. It also provides that “the property owner shall agree to undertake restoration activities” under a plan “prepared by a qualified professional” before a permit next to degraded critical areas or buffers.

    Sources: October 13, 2026 draft, definition of Type Np and 27.12.315(1)(c), p. 37.

    See what it could cost one owner ↓

Third Harvest's position

In Third Harvest's view, the County should resolve the critical areas designations it already has, using the map-correction tool in its own code (CCC 27.12.050), before it expands critical areas. “Government gone wild” is George Peterson's phrase for what this case shows. It is a position, not a legal conclusion.

Also on this pageDrost 2.0: groundwater, 40 years laterThe 1986 USGS groundwater survey, screened against 40 years of public well logs.

This summary is Third Harvest's account of the public record and is not legal advice. Every item links to the detailed section further down this page, where the full quotations and sources appear.

Update, November 9, 2026

This started as one farm crossing on US 101. It is now a reach of the same drainage, with neighbors joining forces and asking the County for answers.

neighbors aware and joining forces
5
neighbors aware and joining forces
parcels in this reach, Third Harvest's included
7
parcels in this reach, Third Harvest's included
acres affected, Third Harvest's estimate
~50
acres affected, Third Harvest's estimate
fish passage at the US 101 culvert, per WDFW
0%
fish passage at the US 101 culvert, per WDFW

Five neighbors are aware and joining forces, seeking remedy and clarification from the County. Together with Third Harvest, that is seven parcels along this reach and roughly 50 acres of land affected by how the County maps and types one small drainage. We are not naming the neighbors, their parcels or their addresses here.

Together, they want a straight answer from Clallam County on how a mapped line became a fish-bearing stream on their land, and how to correct it.

Their parcels were researched one by one through public County, DNR, WDFW and USGS records. The pattern repeats along the reach: streams typed from a map or from physical criteria, culverts the state rates 0% passable, and no fish recorded in any record we found. On a second unnamed channel nearby, the two County-surveyed culverts (WDFW sites 609928 and 609927, February 8, 2018) are both rated total barriers, 0% passable, and DNR types that reach non-fish. Fish use there is presumed on physical criteria only.

What has changed, and why it matters

Five points, each tied to the record. Positions are labeled as Third Harvest's.

AThe only official path

Clallam County has no stream type modification request form of its own. County staff wrote that “The County has no mechanism to modify stream types” (October 15, 2026). The only official path in writing is DNR's Non-Forest Land Water Type Modification Form.

That is why the most recent package, for a neighboring reach on this drainage, went to DNR on November 9, 2026. It follows the October 20 application Third Harvest filed for its own crossing.

State guidance expects more. A county that uses DNR's stream typing system “should develop a process to verify actual stream conditions, identify flow alterations, and locate fish passage barriers by conducting a field visit” (WAC 365-190-130(4)(f)(ii)). Third Harvest has found no such County process.

BThe mandate

State law tells counties exactly what to put first. They “shall give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries” (RCW 36.70A.172(1)).

Anadromous fish run between the sea and fresh water: salmon, steelhead and bull trout. That is what the critical areas mandate protects. Resident cutthroat trout living above a natural barrier are not that run. In Third Harvest's view, a channel that no salmon, steelhead or bull trout can reach should not be regulated as if it holds them.

CThird Harvest's position

In George Peterson's view, the state's own records already answer the question on this drainage, and they are not on the County's table. Here is what they say:

  • WDFW site 995540, US 101 culvert

    “Barrier: Yes. Passability: 0%.”

    WDFW Fish Passage inventory, review January 20, 2004. Site report

  • WDFW site 931064, Dry Creek falls

    A verified total natural barrier: bedrock falls about 20 ft high, “Blockage Total.”

    WDFW natural barrier report, survey March 2, 2010

  • WSDOT site 990128, Dry Creek at US 101

    “No anadromous access due to falls.”

    WSDOT Fish Passage inventory. Full entry: “No anadromous access due to falls upstream from confluence with Straits of Juan de Fuca.”

If those records were on the table, in his view concurrence would be the only conclusion: no anadromous fish can reach these reaches, and the County should agree to retype them.

The law points the same way. Maps “may be too inexact for regulatory purposes,” so counties “should rely primarily on performance standards” (WAC 365-190-080(4)(a)). Counties using DNR water types “should not rely solely on” DNR stream type maps “for purposes of regulating land uses or establishing stream buffers” (WAC 365-190-130(4)(f)(i)). And the County's own code says map information “shall be advisory,” and that critical areas “shall not include those lands where a qualified professional or qualified professional sources demonstrate to the satisfaction of the Administrator that maps or other information used to identify the location and extent of critical areas are in error” (CCC 27.12.050).

Where the records disagree, we say so. The County Streams layer and USGS hydrography carry this water north to Dry Creek, above the 931064 falls. DNR's hydrography routes it west instead. That routing question needs a field check, and the packages say so.

DThird Harvest's position

Today, a farm crossing and the neighbors' land sit in limbo under a stream typing that has never been verified in the field. In Third Harvest's view, that is a temporary taking. As buffers expand, from 60 feet under current code to 150 and 100 feet in the October 13 draft, it is set to become a permanent one.

A temporary taking today. A permanent taking tomorrow. That is unacceptable.

Third Harvest's position

EIn the open

  • October 20, 2026: Third Harvest filed a Non-Forest Land Water Type Modification application for its own crossing.
  • November 9, 2026: a second application, for a neighboring reach, went to DNR on the same form, with the state fish agency included.
  • Parcel research: each parcel in this reach checked against County, DNR, WDFW, WSDOT and USGS public records.
  • Next: concurrence from the state fish or ecology reviewer, and field verification in the wet season, October to March, as state guidance recommends.
  • Not done yet: no protocol fish survey has been done on these reaches. The applications rest on the public record and say so.

Third Harvest's reading of the October 13, 2026 draft

Three changes in the draft of Chapter 27.12, read together. Each is cited to the draft or the current code. It is our reading, and we welcome correction.

What property owners lose under the October 13, 2026 draft of Clallam County Chapter 27.12, in three parts. One: five County water types, in place since Ordinance 681 of December 28, 1999, become DNR's three types, F, Np and Ns. Two: critical areas coverage expands. Stream buffers grow from 100 feet to 150 feet for Type 3 waters that become Type F, and from 50 feet to 100 feet for Type 4 and 5 waters that become Np and Ns. The buffer averaging floor next to Np and Ns waters rises from 25 to 50 feet. Land that meets the criteria is covered even when it is not mapped. Three: the burden of proof shifts. Under current code, Type 5 streams require case-by-case review and confirmation by the County Habitat Specialist. The draft strikes that step, and a stream that meets the physical criteria for fish leaves Type F only if proven not to contain fish or fish habitat, with the responsibility on the applicant at every stage.

AFewer water types

Five County types become three DNR types.

County code since Ord. 681, 12/28/1999

  • Type1
  • Type2
  • Type3
  • Type4
  • Type5
  • FFish
  • NpNon-fish perennial
  • NsNon-fish seasonal

Draft 27.12.310(1)(a), p. 34

Type 1 shorelines move to the Shoreline Master Program (CCC 35).

The County has used Type 1 through Type 5 since Ordinance 681 (December 28, 1999). The draft adopts DNR Forest Practices Water Typing, Type F, Np and Ns, and strikes the Type 1 to 5 definitions. Gone with them: “Designation of Type 5 streams shall require review and confirmation by the Clallam County Habitat Specialist on a case-by-case basis.”

Sources: draft 27.12.310(1)(a), p. 34; draft 27.12.900(84), struck, p. 94; current CCC 27.12.900(84); conversion per CCC 35.35.070.

BMore land covered

Wider stream buffers, more land inside them.

  • Type 3 becomes Type F

    Current code: 100 ft for major, 60 ft for minor development. The draft drops the major and minor split.

  • Type 4 becomes Type Np

  • Type 5 becomes Type Ns

  • Type F reaches any stream that is “known to be used by fish or meet[s] the physical criteria to be potentially used by fish.”
  • The buffer averaging floor next to Np and Ns waters rises from 25 feet to 50 feet.
  • Land that meets the criteria but is “not identified on maps or other publicly available documents” is covered “as well.”
  • Habitats may be “identified by County staff, consulting biologists, or other resources.”

Sources: current CCC 27.12.315, Table 6; draft 27.12.315(1)(a) table, p. 36; draft 27.12.310(1)(a) table, p. 34; draft 27.12.715(1)(a), p. 68; draft 27.12.050, p. 16; draft 27.12.310(1)(b)(i), p. 35. Widths only; this panel does not estimate acres.

CThe burden of proof shifts

Before, the County confirmed the stream. Under the draft, the owner proves the negative.

Current code

The County checks the small streams.

Type 5 designation “shall require review and confirmation by the Clallam County Habitat Specialist on a case-by-case basis.”

Current CCC 27.12.900(84)(e).

October 13 draft

That check is struck. The owner carries the proof.

  • Np row, 27.12.310(1)(a), p. 34: a stream that meets the physical criteria for fish leaves Type F only if it has a stream leaves Type F only if it has “been provenldquo;been proven not to contain fish or fish habitat using methods described in Forest Practices Board Manual Section 23.”
  • 27.12.050, p. 16: a map is in error only where “a qualified professional or qualified professional sources demonstrate to the satisfaction of the Administrator” that it is, with additional information “at the applicant's expense.”
  • 27.12.700(4), p. 65: “At every stage of the application process, the responsibility of demonstrating consistency with this chapter is upon the applicant.”
  • 27.12.740(1), p. 73: “The property owner and/or applicant for a reasonable use exception have the burden of proving that the property is deprived of all reasonable uses.”

27.12.050, 700(4) and 740(1) are existing text the draft carries forward. The Np row is new, and the draft does not say who must do the proving. With the County's case-by-case confirmation struck, these are what remain. Source: the County's October 13, 2026 draft of Chapter 27.12 (PDF page numbers).

Status as of October 20, 2026

What the written record shows on October 20, 2026, and where Third Harvest's position begins.

1The referral loop

The County sends stream typing for this parcel to DNR. DNR Forest Practices writes that it has no jurisdiction. In writing, neither claims the decision, and the burden stays with the landowner.

  • “The DNR administers the Stream Type Modification Form that I provided you and which will need to be submitted to start the retyping process.”

    Todd Coward, Clallam County DCD, email, October 9, 2026

  • “The County has no mechanism to modify stream types.” And: “You will have to defer to the DNR if this would have any bearing on a modification to the DNR's stream type layer.”

    Donella Clark, Clallam County DCD, email, October 15, 2026

  • DNR Forest Practices “does not have jurisdiction on non-forestland water type modifications.” Its Hydro layer “appears to mis-map the segment of interest (LLID 1235319481020),” and there are “known deficiencies in the location and stream typing information.”

    DNR Forest Practices, Olympic Region, written replies to Third Harvest, October 20, 2026

2The County's own determinations

County staff have made this kind of stream typing determination before, without a DNR process.

  • “Clallam County has determined that this is a Type 4/5 stream as allowed per Section 27.12.050 CCC.”

    FPA 2014-00005, Revised Conversion Option Harvest Plan, November 3, 2014, signed by Jennifer Chenoweth, Assistant Planner. DNR file fp2613270 (PDF)

  • “Clallam County will regulate this stream as a type 4/5.”

    FPA 2014-00004, Revised Conversion Option Harvest Plan, December 16, 2014, also signed by Jennifer Chenoweth. DNR file fp2613374 (PDF)

  • “It was determined by DCD staff that the Clallam County Critical Area map is in error with regards to the stream type.” The decision also records that Todd Coward testified that he and Rebecca Mahan, County Habitat Biologist, determined the stream was not a Type III stream but a Type V drainage ditch.

    Clallam County Hearing Examiner, PVAR2024-00011, Findings, Conclusions and Decision (Revised), March 24, 2025. County document 22034 (PDF)

These were findings for individual permits, not amendments to the County's map. They show the County has made this kind of determination when it chose to. In Third Harvest's view, the question is not whether the County can make that determination for this parcel, but why it won't.

3Funnel theory

Third Harvest's position

In Third Harvest's view, the draft shrinks water typing from the County's five types, in place since Ordinance 681 (1999), to DNR's three (F, Np and Ns), expands critical areas coverage, and adopts DNR's forest practices framework before fixing the problems those moves create. The borrowed DNR map defaults run against the landowner, and the burden shifts from the County proving a stream exists to the landowner proving it doesn't. In Third Harvest's view, this appears to operate as a taking without just compensation. We do not state that it is one.

Source: the County's October 13, 2026 draft of Chapter 27.12, Section 27.12.310(1)(a), page 34. The provisions are set out panel by panel in What property owners lose.

4Today's filing

On October 20, 2026 at 5:10 PM Pacific, Third Harvest filed “Addendum to the Appendix: The Referral Loop” into the October 27 hearing record, as a reply to the October 19 Appendix. It went to the same recipients, including Loni Gores, Clerk of the Board, and Bruce Emery. The addendum sets out the referral loop and the County's own determinations shown above, and asks the same question: not whether the County can make this determination, but why it won't.

The October 27 hearing is the continued hearing on the Comprehensive Plan and Zoning (Titles 31 and 33). The Title 27 critical areas update is still before the Planning Commission.

Clallam County is rewriting Chapter 27.12, its critical areas code. The October 13, 2026 draft would retype local streams to the state F, Np and Ns system and widen stream buffers to 150 and 100 feet. The Board of Commissioners continues its hearing on October 27.

This page follows one parcel, 243043 Highway 101, through the written record: what the County's map says, what the only field survey found, what the state fish agency wrote on October 19, and what Third Harvest has asked the County to do. Quotations are verbatim from County correspondence, County code, the draft, state law and agency records. Positions are labeled as Third Harvest's. Where the record does not settle a point, this page says so.

It is written for neighbors. If your land has a mapped stream, ditch or drainage, the same rules reach you.

Our position · Official

  1. Third Harvest will apply for a critical areas permit only after there has been a determination on the stream type in this area.
  2. Third Harvest understands that in any future application where a permit would apply, it will comply.

This is a position on sequencing, not a refusal to comply. The stream type decides the buffer, the crossing design and the permits that apply, so Third Harvest wants that question answered first.

That question is before the County now. Third Harvest has asked the County to give the channel at 243043 Highway 101 no water type, with Type Ns, non-fish seasonal, as the fallback. See what Third Harvest asked the County and what the records show.

This position is about the County's critical areas permit. It does not change Third Harvest's plan, described in Third Harvest's response to WDFW, to apply to WDFW for a Hydraulic Project Approval for the repair work.

Key dates

October 13, 2026
Date of the County's draft of Chapter 27.12, Critical Areas. Comprehensive plan hearing before the Board of Commissioners; the board continued the hearing.
October 19, 2026
WDFW's reply on the crossing. Third Harvest sent its evidence for the hearing record.
October 20, 2026
Draft minutes of the October 13 hearing posted for approval. Third Harvest amended its requests (Request 8, the proposed names) and stated its position on permit applications.
October 27, 2026, 10:30 a.m.
Continued public hearing before the Board of Commissioners.

Updates

A dated log, newest first. This page is updated as the record grows.

  1. Drost 2.0: 40 years later — updating the 1986 USGS ground-water baseline with today's public data

    A new section, Drost 2.0, compares the 1986 USGS inventory with later public Ecology well logs and later studies that could not have been used forty years ago. The Port Angeles-area findings are posted, and a countywide screening of 17,418 Ecology well reports (9,210 water-well logs) is now included, with sources and caveats. It reaches no firm conclusion: the records show patterns, and the open questions need field measurement. The section is a records compilation and a case for a new USGS-cooperative field survey, not a substitute for one.

  2. Third Harvest stated its position on permit applications

    Third Harvest will apply for a critical areas permit only after there has been a determination on the stream type in this area. In any future application where a permit would apply, it will comply.

  3. Third Harvest amended its requests: Request 8, the proposed names

    Third Harvest amended its requests to the County (Request 8), asking the County to decide on and adopt the proposed names Laird Creek and Charles Creek. These are proposed names, not official names. Chickamin Creek is already the federal name.

  4. This page became a running public record

    The Critical Areas page now follows Third Harvest's October 19 hearing record. New entries are added here, newest first.

  5. Third Harvest sent its evidence for the October 27 hearing record

    A summary and a full evidence letter, with maps and exhibits, went to the Board of Commissioners and County staff for the continued hearing.

  6. WDFW replied on the crossing

    WDFW's Area Habitat Biologist for Region 6 wrote to Third Harvest and the County about the crossing. Third Harvest's response, including where WDFW is right, is below.

The motion. Third Harvest's position is that the channel at 243043 Highway 101 is stormwater conveyance and should receive no water type. Type Ns, non-fish seasonal, is the fallback only.

  1. No fish on record. WDFW's 2004 survey at the US 101 culvert (site 995540), the only field record on this channel, walked about 640 ft upstream and 656 ft downstream, past the parcel crossing. The 2004 report records no fish of any species.
  2. A total barrier to anadromous fish downstream. About 1,800 ft (map-measured, a GIS estimate, not a survey) below this tributary's Dry Creek junction, WDFW recorded a roughly 20 ft bedrock waterfall and classed it a total barrier (site 931064, March 2, 2010). On that rating, Third Harvest's position is that no salmon or steelhead can reach the parcel by the County layer's route through Dry Creek. DNR's layer routes the system west toward the Elwha, where Third Harvest has not reviewed barrier records.
  3. The County's own non-fish classifications. The County's 2014 Type 4/5 determination (FPA 2014-00005) and the non-fish “N” codes in the County's own stream layer for this system are missing from the critical areas map, which shows Type 3.

The ask. Third Harvest asks the commissioners to use 243043 Highway 101 as the reason critical areas in Clallam County should not be expanded, and to attach the critical areas update to the comprehensive plan.

On permits. Third Harvest will apply for a critical areas permit only after there has been a determination on the stream type in this area, and in any future application where a permit would apply, it will comply. Read Third Harvest's position on permit applications.

01What's changing

Three changes, each drawn from the draft and the County's own record.

Five local stream types become three state types

The October 13, 2026 draft of Chapter 27.12 (a draft ordinance, not yet adopted) rewrites section 27.12.310(1)(a). Streams would be classified by the Washington Department of Natural Resources Forest Practices Water Typing system, Type F, Np and Ns, in place of the County's current Type 1 through 5 waters.

Five categories collapse into three. In the definitions section, 27.12.900 (page 94 of the draft), the whole current Type 1 through 5 definition set is struck. That includes the sentence: "Designation of Type 5 streams shall require review and confirmation by the Clallam County Habitat Specialist on a case-by-case basis." That local, case-by-case check would be gone.

The buffers are wide. The draft buffer table in section 27.12.315 (page 36) reads: Fs, 150 feet; Np and Ns, 100 feet; non-shoreline natural ponds and lakes under 20 acres, 100 feet. Buffers are measured horizontally from the ordinary high water mark. The draft allows a smaller buffer only "where the landowner can provide evidence that the tree-height potential is less than the standard buffer noted." The jurisdiction table extends County review to land within 200 feet of Type F, Np and Ns waters.

There is one written path out. The draft defines Type Np to include "streams that have been proven not to contain fish or fish habitat using methods described in Forest Practices Board Manual Section 23." That path also puts the work of proof on the owner.

On the record: the ratchet

0:00 / 0:28

“Jefferson County just raised its fish-bearing buffer from 150 to 200 feet, and Futurewise told Jefferson in writing that 200 feet still isn't enough. Their standard is one full 200-year site potential tree height, up to 240 feet in western Washington. There's not a one-time fix, or, that's not a one-time fix, that's a ratchet. Nobody has shown this board proof that any of it works.”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 1:16:17 of the county meeting recording.

The deferral loop

The County defers stream typing on this parcel to DNR. DNR Forest Practices has told George Peterson that this non-forest parcel is outside DNR's water-typing jurisdiction. So the question comes back to the County with no agency holding it. The critical areas ordinance is the County's ordinance, the map is the County's map, and the map error provision, CCC 27.12.050, is the County's own provision. The County's answer is the only one that counts.

The burden lands on the owner

County code already provides the fix. CCC 27.12.050 says map information "shall be advisory," and that critical areas "shall not include those lands where a qualified professional or qualified professional sources demonstrate to the satisfaction of the Administrator that maps or other information used to identify the location and extent of critical areas are in error." State guidance says counties "should clearly state that maps showing known critical areas are only for information or illustrative purposes" (WAC 365-190-080(4)(b)).

Even so, the owner is asked to carry the cost of disproving a map the County has already contradicted in its own 2014 determination. The draft adds to that burden. New section 27.12.315(1)(c) (page 37) provides that "the property owner shall agree to undertake restoration activities or authorize such activities to occur, by means of a restoration plan prepared by a qualified professional" before a permit next to degraded critical areas or buffers. In the same subsection, the existing sentence stating that "Clallam County shall provide information or technical expertise, where possible, in facilitating restoration activities" appears struck out.

Many residents in this county cannot afford engineered plans, habitat management plans and professional reports to answer requests like these.

“The County has no mechanism to modify stream types”

Clallam County, reply to Third Harvest, October 2026

02How stream typing works

The answer to one question sets the buffer, the crossing design and the cost.

Every rule in this update turns on one question: is a stream fish-bearing? The answer decides the buffer, the crossing design, the permits and the cost. So it matters how that answer is reached.

Today. The current code uses the County's own Type 1 through 5 waters, with a local check built in: "Designation of Type 5 streams shall require review and confirmation by the Clallam County Habitat Specialist on a case-by-case basis" (CCC 27.12.900(84)(e)). The October 13 draft strikes that sentence.

Under the draft. Streams would be typed F, Np or Ns, following DNR's forest practices system, which was written for state and private forest lands. Proposed Type F covers "Streams and waterbodies that are known to be used by fish or meet the physical criteria to be potentially used by fish." That second clause is a presumption: a water can be typed fish-bearing without anyone having seen a fish in it.

How the presumption works. WDFW's fish passage manual (2019) separates two kinds of evidence. "'Biological'" "is the visual observation of trout or salmon during a site visit." "'Physical'" "is based on measurements of gradient and scour line width" (p. 2-4). In western Washington the width threshold is about 2.0 ft (the manual's 0.61 meters). The manual also says fish use potential "is not restricted by man-made barriers" (p. 2-3), so a culvert rated 0% passable does not change the presumption.

“If no native salmonids are observed, apply the Physical criteria”

WDFW Fish Passage Inventory, Assessment and Prioritization Manual (2019), p. 2-4

What counts as a natural barrier. The same manual classes a natural waterfall as a barrier only when it is "a single, near vertical drop > 3.7 meters in height" (more than about 12.1 ft), and a gradient barrier as a sustained 20 percent slope for about 525 ft (the manual's 160 meters). It adds that these criteria "do not supersede fish typing guidelines published by other state or federal organizations."

Why it matters at a crossing. WAC 220-660-190, the state fish passage rule for water crossings, "applies only to water crossings over fish-bearing waters." Chapter 220-660 WAC does not define "fish-bearing" in its definitions section. It does define "fish habitat" to include "potential habitat likely to be used by fish life" (WAC 220-660-030(52)). Once a channel is presumed fish-bearing, a farm crossing can be held to the fish passage design standard.

The one written way out. The draft defines Type Np to include "streams that have been proven not to contain fish or fish habitat using methods described in Forest Practices Board Manual Section 23." That path puts the work of proof, and its cost, on the owner.

Third Harvest's position

A presumption is a starting point, not a finding. In Third Harvest's view, a three-point system with no category for stormwater drainage lets a channel that carries runoff be typed fish-bearing on physical criteria alone, and leaves the owner to disprove it.

03The case study

Every rule change lands somewhere. Here is one place it lands.

243043 Highway 101 (Clallam County parcel 073014-110050) is the parcel Third Harvest holds under contract through a purchase-and-sale agreement. The land has been owned and used since at least 1926. The 1939 aerial photographs show worked fields on both banks of the drainage. A farm crossing has served this land for generations, and in its October 15 reply the County wrote that "Farmers frequently just drove through streams without establishing a permanent crossing."

Stormwater also reaches this parcel from 208 Laird Road, Third Harvest's adjoining parcel (073014-120000). As George Peterson has described to the County in writing, a curtain drain along the south side of 208 Laird Road, which predates Third Harvest's purchase, directs stormwater toward the creek.

The map does not match the record. The County's critical areas map shows this drainage as Type 3. In 2014, under Harvest Plan FPA2014-00005 for the parcel just south of US 101, the County wrote that the same drainage "is shown as a Type 3 per the Clallam County Critical Areas map," but that "based on the WDFW SalmonScape map, Clallam County has determined that this is a Type 4/5 stream as allowed per Section 27.12.050 CCC." The County has already corrected its own map for this drainage once. It has not reconciled that determination with the Type 3 it applies here.

The answers have been administrative judgments, not site findings. The County has said that "The County has no mechanism to modify stream types," and has referred stream typing to the Department of Natural Resources in an October 9 email and in October 14 and October 15 replies. It has pointed toward a variance, and an October 9 email stated that "the approval of a variance is not likely as the criteria has not been met."

In George Peterson's view, the direction is clear. A farm crossing used for generations is being held in limbo while basic questions go unanswered, which he believes already raises the question of a temporary taking. If the October 13 draft is adopted and applied on top of the current mapping, he believes that limbo could become permanent. He states this as his belief, not as a legal conclusion.

“Farmers frequently just drove through streams without establishing a permanent crossing.”

Clallam County, reply to Third Harvest, October 15, 2026

On the record: the mapping problem

0:00 / 0:10

“So here's my problem. If I go to Bruce and I'm like, Bruce, I got a problem on my property. We have existing mapping and administrative issues already with the critical areas.”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 3:09:29 of the county meeting recording.

A classification without a study

George Peterson has seen no documentation that this channel has ever been studied on the ground. He has asked the County in writing whether it will review the evidence on site and by video before any determination is final, and that question remains unanswered.

The evidence on the record points the other way. The County's own Type 4/5 determination under FPA2014-00005 covers the same drainage. The WDFW record shows a total barrier to fish at the US 101 culvert (0% passable), with a natural vertical fall of about 8 ft about 525 ft upstream of the culvert. North of the highway, after blackberry removal that County staff said was allowed, the section running down to the crossing shows no creek bed and no channel.

In George Peterson's view, the best available science in this record is the evidence he has put before the County, including the County's own documents, not an unverified map layer.

The parcel under three buffer widths

The maps below use 243043 Highway 101 (Clallam County parcel 073014-110050, 2.27 acres in County GIS) on USDA NAIP aerial imagery. The buffers follow the County's mapped stream lines, which are not field findings: George Peterson reports that the north section of the parcel has no channel at all. Every figure is a GIS estimate from public data and is not survey-grade. Sources: Clallam County Parcels_Published, Streams (Stream Type) and Wetlands layers; imagery from USDA NAIP via USGS The National Map (public domain).

60-foot buffer along the mapped channel on parcel 073014-110050
Before: current code, 60 feet. GIS estimate: about 0.82 of 2.27 acres (36%). Source: current CCC 27.12.315.
150-foot and 100-foot buffers on parcel 073014-110050
After: Oct 13 draft, 150 feet for Type F. GIS estimate: about 1.70 of 2.27 acres (75%); 1.27 acres (56%) at the 100-foot Np/Ns width. Source: Oct 13 draft CCC 27.12.315.
240-foot buffer on parcel 073014-110050
Worst case: 240 feet. GIS estimate: about 2.20 of 2.27 acres (97%). Worst case is George Peterson's belief about where the County's mapping is headed; not a County proposal. Source: WDFW riparian guidance, western Washington site-potential tree height range.

04What the records show

In 2004 a state fish agency (WDFW) crew assessed the US 101 culvert on this drainage (site 995540). They rated it a total barrier to fish: 0% passable, because of its 12.3% slope.

The state did rate the channel as having fish-use potential. That rating was based on physical criteria, the size and slope of the channel, not on any fish being recorded.

Upstream, on February 3, 2004, the survey walked about 640 ft and recorded a natural vertical fall of about 8 ft (2.5 m), about 525 ft (160 m) above the culvert. WDFW's manual classes a waterfall as a natural barrier only above about 12.1 ft (3.7 m), so this is a natural vertical fall, not a WDFW-classed barrier.

Downstream, on March 30, 2004, the survey walked about 656 ft (200 m), past the crossing at 243043 Highway 101. The 2004 report records no fish of any species and rates the reach "Significant Reach: No."

That is the only fieldwork on record for this channel. The County's typing rests on whether the channel could hold fish. The only on-the-ground record records none. The roughly 0.9 mile of channel from there to W Edgewood Drive has never been surveyed or typed in the field.

Map of the drainage from the US 101 culvert, WDFW site 995540, north past the crossing at 243043 Highway 101 to the W Edgewood Drive culvert, site 609929. The 2004 WDFW survey covers about 656 ft below the culvert and about 640 ft above it, with a natural vertical fall of about 8 ft about 525 ft upstream; the reach beyond the survey to W Edgewood Drive, about 0.9 mile, is marked no fieldwork on record.
Map 1 in the hearing record. The 2004 WDFW habitat survey (site 995540) walked about 656 ft downstream from the US 101 culvert, past the crossing at 243043 Highway 101, and about 640 ft upstream; the 2004 report records no fish. The stretch from the end of the survey to W Edgewood Drive, about 0.9 mile, has no fieldwork on record. Survey lines and the fall are placed by distance along the County's mapped stream line and are approximate. Source: WDFW Fish Passage and Diversion Screening Inventory, site 995540. Download the PDF.

Three classifications for one drainage

The County's own records type this drainage three ways: Type 3 on the County critical areas map; Type 4/5 in the County's 2014 written determination for the reach just upstream (FPA 2014-00005); and Type F in DNR's 2014 forest practices file.

“Clallam County has determined that this is a Type 4/5 stream as allowed per Section 27.12.050 CCC.”

Clallam County, Revised Conversion Option Harvest Plan, FPA 2014-00005 (2014)

Third Harvest's position: the County's own records carry this argument.

On the channel WDFW pointed to in its emails, the February 8, 2018 Clallam County surveys at WDFW sites 609928 (Laird Rd) and 609927 (Granite Rd) both record full barriers (“Barrier: Yes,” “Passability (%): 0”). The County Streams layer (feature 79959) and DNR's hydro layer (WC_ID 222636) both type that channel “N,” non-fish. WDFW's own 2004 site on it at US 101, site 995836, is coded Fish Use Potential “No.”

In Third Harvest's view, the burden is on the County to produce a study or record showing fish, and none appears in the public WDFW, County or DNR records reviewed.

The 2004 and 2018 sites, side by side

WDFW site 995540

US 101 culvert, MP 243.08, on the crossing's own channel (proposed name Laird Creek)

WDFW crew, January 20, 2004; surveys February 3 and March 30, 2004

Fish Use Potential: Yes, on "FUP Criteria: Physical." Barrier: Yes, 0% passable, reason Slope. "Significant Reach: No."

Fish: None recorded

WDFW site 995836

US 101, MP 242.69, on the separate channel WDFW pointed to

WDFW crew, January 20, 2004

Fish Use Potential: No. Site comment "OHW < 0.61m" (under about 2.0 ft).

Fish: None recorded

WDFW site 609928

Laird Rd culvert, on that separate channel (County feature 79959)

Clallam County crew, February 8, 2018, Level A

Fish Use Potential: Yes, on Physical criteria. Barrier: Yes, 0% passable, reason Slope.

Fish: None recorded

WDFW site 609927

Granite Rd culvert, on that separate channel (County feature 79959)

Clallam County crew, February 8, 2018, Level A

Fish Use Potential: Yes, on Physical criteria. Barrier: Yes, 0% passable, reason WS Drop.

Fish: None recorded

WDFW site 609929

W Edgewood Drive culvert, downstream of the parcel

Clallam County, April 2, 2018 (culvert only)

Passability 67%. No walk recorded; fish use "Mapped," not observed.

Fish: None recorded

WDFW site 931064

Dry Creek falls, below the whole system

WDFW natural barrier assessment, March 2, 2010

Waterfall about 20 ft high. "Blockage: Total."

Fish: Not a fish survey

Sources: WDFW Fish Passage and Diversion Screening Inventory site reports (fortress.wa.gov/dfw); WDFW Natural Barrier Assessment, site 931064. “Fish” means fish recorded in the report.

A total barrier below the whole system

In the County layer, the channel runs north from the parcel through a pond and the W Edgewood Drive culvert (WDFW site 609929) to the stream WDFW's record names Chickamin Cr., a tributary of Dry Creek. About 1,800 ft below that junction (a GIS estimate measured along the SalmonScape Dry Creek line, not a survey), WDFW recorded a natural bedrock waterfall about 20 ft high and classed it a total barrier (site 931064, "Blockage: Total").

“Dry Creek flows over an impassable 20-foot bedrock falls/cascade.”

WRIA 18 Watershed Plan

Third Harvest's position is that no salmon or steelhead can pass the falls to reach the parcel. That holds on the County layer's route. DNR's layer routes this system west toward the Elwha, and the 995540 report lists the stream as "Tributary To: unnamed Elwha R trib"; Third Harvest has not reviewed barrier records on that route. Only a field check can settle the route.

Two limits, stated plainly. The same plan records "a resident population of cutthroat trout above the falls," and Third Harvest does not dispute that. SalmonScape lines for some anadromous runs also extend above the falls, which conflicts with WDFW's barrier record. The branch through the US 101 culvert has no fish record of its own.

Map from the US 101 culvert, WDFW site 995540, north to the Strait of Juan de Fuca, showing the County layer's route north through the pond and the W Edgewood Drive culvert to Chickamin Creek and Dry Creek, DNR's route west toward the Elwha, and WDFW total barrier site 931064, a bedrock waterfall about 20 ft high on Dry Creek.
Map 3 in the hearing record: the downstream record. Both recorded routes are shown. The 1,800 ft distance from the junction to the falls is a GIS estimate along the SalmonScape Dry Creek line, not a survey. Sources: WDFW sites 931064, 995540 and 609929; WDFW SWIFD (SalmonScape); WRIA 18 Watershed Plan; Clallam County Streams layer; DNR hydrography. Download the PDF.

Naming the water: proposed names for the County to decide

Today this drainage is unnamed in the County and DNR layers, so agencies, landowners and maps describe the same water in different ways. Third Harvest has asked the County to decide on and adopt two proposed names (Request 8). They are proposals, not official names, until the County acts.

Laird Creek (proposed). For the whole drainage, honoring 1889 settler Mace J. Laird: the unnamed reach across parcel 073014-110050 up to the US 101 culvert, and the channel through the W Edgewood Drive culvert north to the Dry Creek junction.

Charles Creek (proposed). For the unnamed mill-site channel between the proposed Laird Creek and Chickamin Creek, honoring former Lower Elwha Klallam Tribal Chairwoman Frances G. Charles, with the Tribe invited to advise. Federal and state naming policies disfavor names that honor living persons, so formal federal adoption would likely wait.

Chickamin Creek (federal name). This one is already official: GNIS feature 2090071, Board Decision June 6, 2006, for the eastern Dry Creek tributary about 0.46 mile east of the proposed Laird Creek junction. Third Harvest asks the County to use it; the County Streams layer and DNR hydrography leave it unnamed.

All three systems reach Dry Creek, the main stem.

05WDFW's reply

What the state fish agency wrote, where it is right, and where the record points elsewhere.

On October 19, 2026, WDFW's Area Habitat Biologist for Region 6 (Port Angeles) replied to Third Harvest and the County. Third Harvest thanks her for writing. What follows is Third Harvest's reading of public records, not a survey or a finding. Distances are GIS estimates from public data.

“WDFW does not have any authority over determinations made by the County just as the County’s determinations do not supersede or dictate the application of WDFW’s regulatory authority.”

WDFW Area Habitat Biologist, Region 6, email of October 19, 2026. Third Harvest agrees with that division of roles.

Which crossing the email describes

She wrote: “The stream segment that your crossing is located on has two culvert assessments (Site IDs 609927 and 609928) on record which both identify the watercourse as meeting the physical criteria for fish use.”

Those two sites are on a different channel. They sit on County Streams feature 79959, along Laird Road at the northwest corner of 208 Laird Road, about 1,160 ft and 1,340 ft in straight lines from the crossing at issue on parcel 073014-110050. Neither is upstream of that crossing on any mapped channel. Her distances do fit the crossing WDFW circled in yellow in an August 3 email, which George Peterson told WDFW on August 6 was not the crossing at issue. Third Harvest has asked WDFW to confirm in writing which crossing its email addresses.

Map of where fieldwork was done on this drainage: the 2004 WDFW survey at the US 101 culvert, site 995540, the 2018 County assessment at the W Edgewood Drive culvert, site 609929, pond 81153 and the SalmonScape cutthroat line on the eastern branch.
Map 2 in the hearing record: where fieldwork was done, and where the mapped branches meet. Positions and distances are GIS estimates from public data, not survey-grade. Sources: WDFW sites 995540 and 609929; WDFW SWIFD (SalmonScape); Clallam County Streams layer. Download the PDF.

The fall above the US 101 culvert

For the crossing WDFW circled, she is correct that the fall recorded at site 995540 is on a different tributary. For the crossing at issue, the record shows the fall upstream on the same tributary: the US 101 culvert sits about 270 ft upstream of the crossing, and the 2004 survey recorded a natural vertical fall of about 8 ft (2.5 m) about 525 ft (160 m) above the culvert. Third Harvest also corrected its own earlier wording: the culvert does not “end at” the fall.

What Third Harvest concedes

  • A barrier upstream of a crossing does not by itself keep fish from reaching that crossing from below.
  • A fall of about 8 ft does not meet WDFW's waterfall test of about 12.1 ft (3.7 m), so Third Harvest calls it a natural vertical fall, not a WDFW-classed barrier.
  • The 2018 County assessments at 609927 and 609928 were in-person Level A culvert assessments, both coded as meeting the physical criteria, and the channel widths recorded (about 4.3 ft and 5.9 ft) exceed WDFW's width threshold.
  • On the crossing's own channel, WDFW's 2004 site 995540 is coded “Fish Use Potential: Yes” on “FUP Criteria: Physical.” That same record recorded no fish, rated the culvert 0% passable and rated the reach “Significant Reach: No.”
  • WDFW's practice allows physical criteria to stand in for fish presence.
  • An HPA is required for work in state waters whether or not fish are present. Third Harvest will apply for one for the repair work.

A predetermination

“This requirement exists at the crossing location in question, regardless of whether the County considers it historical.”

WDFW Area Habitat Biologist, Region 6, email of October 19, 2026

Third Harvest's position is that applying the fish-bearing crossing criteria before any HPA application, site review or fish-bearing determination for this crossing's channel is a predetermination. It rests on physical-criteria coding at two County sites on a different channel, where the County layer, DNR's layer and WDFW's own 2004 site all say non-fish. Third Harvest asks WDFW to make that determination on a site-specific record at HPA review.

The 2004 record

WDFW's earlier emails said the stream was assessed “in 2004 and in 2018.” The October 19 email cites only the 2018 County assessments. The only 2004 WDFW site on the channel WDFW circled, site 995836, is coded Fish Use Potential “No.” The only nearby 2004 “Yes” record is site 995540, on the crossing's own channel, on physical criteria, with no fish recorded. The October 19 email does not say which 2004 assessment WDFW meant.

Read the full rebuttal: Part 9A of the evidence letter

Web edition of Part 9A as sent on October 19, 2026. Names of agency staff are replaced with titles, and the proposed name Laird Creek is marked as proposed. References to other Parts, maps and exhibits are to the full evidence letter.

On October 19, 2026, WDFW's Area Habitat Biologist for Region 6, Port Angeles Office, replied on this thread, with a copy to a WDFW colleague. She wrote that she offered her points "purely as information that you and/or the County may find helpful," and that "WDFW does not have any authority over determinations made by the County just as the County’s determinations do not supersede or dictate the application of WDFW’s regulatory authority." We thank her for writing, and we agree with that division of roles. What follows is Third Harvest's position, tied to the records cited. It is a reading of public records, not a survey or a finding. Distances are GIS estimates from public data, not survey-grade.

(a) Which crossing her email describes.

She wrote: "The stream segment that your crossing is located on has two culvert assessments (Site IDs 609927 and 609928) on record which both identify the watercourse as meeting the physical criteria for fish use. These assessments were made on-the-ground via in-person level A assessments in 2018. These assessments were both located upstream of your crossing site by less than 0.1 mile."

Her email attaches her August 3, 2026 email, which asked George Peterson to "confirm that the yellow circled area on the map image below would be the approximate location for your project." On August 6, 2026, George Peterson answered her, with the same copies: "The Creek crossing that you have indicated here is incorrect. No repairs needed there. The Creek further to the east," and gave the parcel number of APN 073014-110050.

The crossing at issue in this record is Crossing A in the October 12 Parcel Crossing Record, on APN 073014-110050. It sits about 17 ft from County Streams feature 79960 (LLID 1235319481020, the channel this letter proposes to name Laird Creek). The two sites she cites are on a different channel:

  • WDFW site 609928 (Laird Rd) is about 1,160 ft (0.22 mile) from Crossing A, and WDFW site 609927 (Granite Rd) is about 1,340 ft (0.25 mile) from it, in straight lines.
  • Both sit on County Streams feature 79959, LLID 1235518481150: 609928 is about 3 ft from that line and 609927 about 86 ft. At its closest, that channel is about 410 ft from feature 79960.
  • Neither site is upstream of Crossing A on any mapped channel. The two channels meet only downstream of Crossing A: about 2,350 ft down the proposed Laird Creek line in the County layer, or, in DNR's layer, at a junction about 670 ft north of Crossing A.

Her figures do fit the crossing she circled in yellow, on the narrow north strip of 208 Laird Road, which lies about 9 ft from feature 79959. Measured along that channel, 609928 is about 230 ft upstream of the yellow crossing, and 609927 is about 680 ft upstream (about 0.13 mile; 555 ft in a straight line). So "less than 0.1 mile" is accurate for 609928 and a little short for 609927.

Third Harvest's position: points (b), (c) and (d) of her email describe the channel she circled in yellow, which George Peterson told WDFW on August 6 is not the crossing at issue. We respectfully ask WDFW to confirm in writing which crossing its October 19 email addresses.

(b) The fall above the US 101 culvert: the same tributary as Crossing A.

She wrote: "I would like to clarify that the natural barrier you are referencing (from Site ID report 995540) is located on an upstream segment of a different, separate, tributary of the watercourse. The upstream natural barrier on the other tributary would not preclude or affect fish use or criteria at the crossing site you identified on your property."

For the yellow crossing, she is correct: site 995540 and its fall are on a different tributary from feature 79959. For Crossing A, the record shows the opposite. WDFW site 995540, the US 101 culvert at MP 243.08, sits about 17 ft from County feature 79960, the same County segment and the same LLID (1235319481020) as Crossing A, about 270 ft upstream of it. The 2004 upstream survey from that culvert (WDFW crew, 2/3/2004) recorded: "Gradient varies from 5% to 17%. At 160 m US, bedrock cascade with an elevation drop of 5 m in an 8 m run with a 2.5 m vertical fall." In US units, that is about 525 ft upstream, a drop of about 16 ft in a run of about 26 ft, with a vertical fall of about 8.2 ft. Placed 525 ft up the County line from the culvert, the fall also lands on feature 79960. On Crossing A's channel, the fall is upstream on the same tributary, not on a separate one.

Third Harvest also corrects its own October 16 wording. George Peterson wrote of "the WDFW record of a total barrier at the US 101 culvert that ends at a natural 2.5 meter bedrock fall" (about 8.2 ft). The culvert does not end at the fall. The fall is about 525 ft upstream of the culvert, as Part 1 and the first map show.

We also concede two points of substance. First, a barrier upstream of a crossing does not by itself keep fish from reaching that crossing from below. Second, WDFW's Fish Passage Inventory, Assessment and Prioritization Manual (2019, Pub. 02061, p. 7-2) defines a natural waterfall barrier as "a single, near vertical drop > 3.7 meters in height" (more than about 12.1 ft), and a gradient barrier as a sustained gradient of 20 percent or more for about 525 ft or more (the manual's 160 meters). A vertical fall of about 8.2 ft does not meet that waterfall test as written, so this letter calls it a natural vertical fall, not a WDFW-classed natural barrier. The manual adds that these criteria identify "the upper limit of adult salmonid upstream access" and "do not supersede fish typing guidelines published by other state or federal organizations."

Third Harvest's position is that the fall still bears on Crossing A. The US 101 culvert between Crossing A and the fall is itself a WDFW-recorded total barrier ("Barrier: Yes," "Passability (%): 0," "Reason: Slope"). It leaves about 270 ft of channel between the crossing and the culvert. WDFW's own 2004 report rates the reach "Significant Reach: No," with a potential habitat gain of about 525 ft (recorded as 160 m). The fall is also roughly three times the highest documented cutthroat jump of about 2.8 ft shown in the fourth exhibit.

(c) Natural barriers upstream and downstream.

She wrote: "The stream segment that your crossing is located on does not have a documented natural barrier upstream showing in the available data."

  • On the channel she circled (feature 79959), we do not contradict her. The next WDFW site upstream, 995836 at US 101, is coded Fish Use Potential "No," but it is not a barrier record ("Barrier: N/A").
  • On Crossing A's channel, the 2004 WDFW survey documents the fall described in (b), above a culvert WDFW rated 0 percent passable. As conceded above, the fall is not a WDFW-classed natural barrier.
  • Downstream barriers matter more for fish access. In the County layer, Crossing A's channel runs north through the pond and the W Edgewood Drive culvert (site 609929, "Passability (%): 67") to Chickamin Cr. and Dry Creek. About 1,800 ft below that junction (a GIS estimate, not a survey), WDFW recorded a bedrock waterfall about 20 feet high and classed it a total barrier (site 931064, "Blockage: Total," 3/2/2010). That height is well over WDFW's waterfall test of about 12.1 ft. On that rating, Third Harvest's position is that no salmon or steelhead can reach Crossing A by that route.

Two limits apply, and we state them plainly. First, the WRIA 18 Watershed Plan records "a resident population of cutthroat trout above the falls." WAC 220-660-190 is not limited to anadromous fish. Second, the route is not settled. DNR's layer routes this system west toward Type S water near the Elwha, and the 995540 report lists the stream as "Tributary To: unnamed Elwha R trib." Third Harvest has not reviewed barrier records on that route, so on that route this record shows no documented downstream barrier either way. Only a field check can settle the route.

(d) Sites 609927 and 609928: what the reports say.

The two reports she attached read, for both sites: "Fish Use Potential: Yes," "FUP Criteria: Physical," "Data Source: Clallam County," "Field Crew: Clallam County crew," "Review Date: 2/8/2018," "Method: Level A," "Barrier: Yes," "Passability (%): 0," "Significant Reach: Unknown." The reason is "WS Drop" at 609927 and "Slope" at 609928.

We concede what is accurate. These were in-person Level A culvert assessments in 2018, and both are coded as meeting the physical criteria. The average channel widths recorded, about 4.3 ft at 609927 and about 5.9 ft at 609928, exceed WDFW's scour line width threshold for western Washington of about 2.0 ft (the manual's 0.61 meters, p. 2-4).

Third Harvest's position on what they do not show:

  • Physical-criteria coding is not a fish observation. WDFW's manual separates "'Biological'," which "is the visual observation of trout or salmon during a site visit," from "'Physical'," which "is based on measurements of gradient and scour line width" (p. 2-4). Both sites are coded Physical, not Biological. Neither report records any fish.
  • Both culverts are full barriers. WDFW's reports state that "The barrier status reported in this document is based on the swimming abilities of adult salmonids," and both record 0 percent passability. We concede that, under WDFW's manual, fish use potential "is not restricted by man-made barriers" (p. 2-3). The barrier rating speaks to passage, not to whether the channel is presumed fish-bearing.
  • Both are Clallam County crew assessments, and both sit on feature 79959, not on Crossing A's channel (see (a)).

(e) Presuming the crossing is fish-bearing.

She wrote: "I want to clarify that WDFW requires any crossing on a fish-bearing stream to meet the fish passage criteria in WAC. This requirement exists at the crossing location in question, regardless of whether the County considers it historical." She also wrote: "I look forward to reviewing your HPA application once it is submitted." Her attached August 3 email says a permittable crossing "would need to meet the requirements of WAC 220-660-190 for a fish-bearing watercourse."

We want to be accurate about the law. An HPA is required for work in waters of the state whether or not fish are present. RCW 77.55.031 states: "Work within the ordinary high water line of state waters to construct or repair a ford or crossing requires a permit." (The full section is quoted in (f).) Third Harvest does not question WDFW's HPA review, and it will apply for an HPA for the repair work.

The narrower point is this. WAC 220-660-190 states: "This section applies only to water crossings over fish-bearing waters. Crossings on nonfish bearing streams must be designed to pass wood and sediment expected in the stream reach to reduce the risk of catastrophic failure of the crossing." Chapter 220-660 WAC does not define "fish-bearing" in its definitions section (WAC 220-660-030). It does define "fish habitat" to include "potential habitat likely to be used by fish life" (WAC 220-660-030(52)). WDFW's manual lets physical criteria stand in for fish presence: "If no native salmonids are observed, apply the Physical criteria" (p. 2-4). We acknowledge that WDFW's practice allows that presumption.

Third Harvest's position is that applying the fish-bearing crossing criteria before any HPA application, any site review at Crossing A or any fish-bearing determination for Crossing A's channel is a predetermination. It rests only on 2018 physical-criteria coding at two County sites on a different channel. On that channel, the County Streams layer (feature 79959) and DNR's hydro layer (WC_ID 222636) both type the reach "N," non-fish, and WDFW's own 2004 site 995836 is coded Fish Use Potential "No." On Crossing A's own channel, we concede that WDFW's 2004 site 995540 is coded "Fish Use Potential: Yes" on "FUP Criteria: Physical." That same record recorded no fish, rated the culvert 0 percent passable and rated the reach "Significant Reach: No."

We ask that WDFW make its fish-bearing determination for Crossing A on a site-specific record at HPA review. One provision bears directly on that review:

  • WAC 220-660-030(151)(d): the definition of watercourse "does not include irrigation ditches, canals, storm water treatment and conveyance systems, or other entirely artificial watercourses, except where they exist in a natural watercourse that has been altered by humans." This bears on Third Harvest's stormwater position (Part 8).

(f) State law, the County's critical areas code and RCW 77.55.031.

RCW 77.55.031, titled "Driving across established ford," reads in full: "The act of driving across an established ford is exempt from a permit. Driving across streams or on wetted streambeds at areas other than established fords requires a permit. Work within the ordinary high water line of state waters to construct or repair a ford or crossing requires a permit." It is the state's ford and crossing provision. It is not the general permit requirement, and it is not the fish passage standard.

The general permit requirement is RCW 77.55.021(1): "Except as provided in RCW 77.55.031, 77.55.051, 77.55.041, and 77.55.361, in the event that any person or government agency desires to undertake a hydraulic project, the person or government agency shall, before commencing work thereon, secure the approval of the department in the form of a permit as to the adequacy of the means proposed for the protection of fish life." RCW 77.55.021(7)(a) adds: "Protection of fish life is the only ground upon which approval of a permit may be denied or conditioned. Approval of a permit may not be unreasonably withheld or unreasonably conditioned." The fish passage standard for crossings is WAC 220-660-190, quoted in (e).

The dates, stated accurately:

  • The state's hydraulic permit requirement dates to 1949 (1949 c 112 s 49). It was formerly RCW 75.20.100, then RCW 77.55.100, and is now RCW 77.55.021.
  • Clallam County adopted its first critical areas ordinance, Ord. 471, on June 16, 1992. Chapter 27.12 CCC was most recently amended by Ord. 1030 on June 10, 2025.
  • RCW 77.55.031 itself came later. It was enacted in 2005 (2005 c 146 s 301).
  • The established-ford test looks back to a crossing "used annually before 1986."

Which law governs does not depend on which came first. Article XI, section 11 of the Washington Constitution provides: "Any county, city, town or township may make and enforce within its limits all such local police, sanitary and other regulations as are not in conflict with general laws." State law also requires the County to protect critical areas. RCW 36.70A.060(2) provides: "Each county and city shall adopt development regulations that protect critical areas that are required to be designated under RCW 36.70A.170." RCW 36.70A.172(1) directs counties to "give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries." The County's own code states that chapter 27.12 "shall be deemed neither to limit nor repeal any other powers under State statute or County regulation" (CCC 27.12.010). The HPA and the County's code therefore apply side by side, and neither displaces the other.

Third Harvest's position, within those limits:

  • State law governs fish passage at water crossings, and WDFW decides at HPA review whether a crossing must meet the fish-bearing standard. The County's critical areas code applies alongside that law and cannot be applied in conflict with it. The County should not treat the channel at Crossing A as fish-bearing, or condition the crossing on a fish passage design, on the strength of a map layer alone when no agency has made a site-specific fish-bearing determination for Crossing A.
  • The history of this crossing reaches back before both of the dates that matter. The record shows the farm owned and used since at least 1926 (deed, instrument 111140), worked fields on both banks in the 1939 aerials, and the County's own October 15 statement that "Evidence that farmers drove through the creek on cinderblocks may exist." That is earlier than the state's 1986 established-ford date and earlier than the County's June 16, 1992 ordinance.
  • WAC 220-660-030(44) defines an established ford as "a crossing place in a watercourse that was in existence and used annually before 1986 or permitted by the department in or after 1986, and has identifiable approaches on the banks." Third Harvest will ask WDFW whether continued use of Crossing A by driving across it, with no culvert placed, qualifies. Whether the crossing was used annually before 1986 is a question of fact that this record does not yet settle. If it qualifies, driving across needs no state permit. Repair work within the ordinary high water line still needs an HPA, and Third Harvest will apply for one.
  • The County's parallel question is its own: whether the crossing is a lawfully established pre-existing use under CCC 27.12.040. The state exemption does not answer that question for the County, and the County has not answered it (Part 9).

(g) The 2004 WDFW record she does not cite.

Her October 19 email cites only the 2018 County assessments. Neither the email body nor the two site reports mention 2004 or site 995836. Her attached August 3 email does quote her July 17 email: "During these assessments, done in 2004 and in 2018, both agencies determined that the stream meets the physical criteria for fish use." So her correspondence relies on a 2004 assessment, but it never identifies one.

The only 2004 WDFW site on the channel she circled is 995836 (US 101, MP 242.69, WDFW crew, 1/20/2004). It sits about 59 ft from County feature 79857, the next segment upstream on the same LLID (1235518481150) as 609927 and 609928. It is about 770 ft upstream of 609927, about 1,310 ft from the yellow crossing and about 2,050 ft from Crossing A. Its report reads "Fish Use Potential: No," with the site comment "OHW < 0.61m" (under about 2.0 ft), which is below WDFW's width threshold of about 2.0 ft. It is not on Crossing A's channel, and we do not offer it as a record of Crossing A. It is on the very stream her two 2018 sites sit on, and it is coded the opposite way.

The 2004 WDFW record on Crossing A's own channel is 995540. As conceded in (e), it is coded "Yes" on physical criteria, with no fish recorded.

Third Harvest's position: an account of the circled channel that cites the 2018 County coding should also cite WDFW's own 2004 "No" on that same stream. And neither 2004 site supports the July 17 sentence as written. 995836 is coded "No." The 2004 "Yes" record, 995540, is on Crossing A's channel, which is not where her red dots are.

(h) Future correspondence.

Third Harvest will address future correspondence on this crossing to WDFW's Area Habitat Biologist and to WDFW's Region 6, Port Angeles Office.

06State law and County code

Which rules apply to a farm crossing, and who decides.

The state hydraulic code and the crossing

RCW 77.55.031, titled “Driving across established ford,” reads in full:

“The act of driving across an established ford is exempt from a permit. Driving across streams or on wetted streambeds at areas other than established fords requires a permit. Work within the ordinary high water line of state waters to construct or repair a ford or crossing requires a permit.”

RCW 77.55.031

State rule defines an established ford as "a crossing place in a watercourse that was in existence and used annually before 1986 or permitted by the department in or after 1986, and has identifiable approaches on the banks" (WAC 220-660-030(44)). The general permit requirement is RCW 77.55.021, which adds: "Protection of fish life is the only ground upon which approval of a permit may be denied or conditioned. Approval of a permit may not be unreasonably withheld or unreasonably conditioned" (RCW 77.55.021(7)(a)).

The dates, stated accurately. The state's hydraulic permit requirement dates to 1949 and is now RCW 77.55.021. Clallam County adopted its first critical areas ordinance on June 16, 1992; Chapter 27.12 CCC was most recently amended on June 10, 2025. RCW 77.55.031 itself came later, in 2005.

Which law governs does not depend on which came first. Under Article XI, section 11 of the Washington Constitution, a county may make regulations "as are not in conflict with general laws." State law also requires the County to protect critical areas (RCW 36.70A.060(2)), and the County's own code says chapter 27.12 "shall be deemed neither to limit nor repeal any other powers under State statute or County regulation" (CCC 27.12.010). The state hydraulic code and the County's code apply side by side, and neither displaces the other.

Third Harvest's position, within those limits

  • WDFW decides at HPA review whether a crossing must meet the fish-bearing standard. The County should not treat this channel as fish-bearing, or condition the crossing on a fish passage design, on the strength of a map layer alone.
  • The history of this crossing reaches back before both dates that matter: the land has been owned and used since at least 1926, the 1939 aerials show worked fields on both banks, and the County's October 15 reply said that “Evidence that farmers drove through the creek on cinderblocks may exist.”
  • Whether this crossing qualifies as an established ford, used annually before 1986, is a question of fact the record does not yet settle. Third Harvest will put it to WDFW. If it qualifies, driving across needs no state permit; repair work still needs an HPA.
  • Whether the crossing is a lawfully established pre-existing use under CCC 27.12.040 is the County's own question. The state exemption does not answer it, and the County won't answer it in writing.

Sources: RCW 77.55.031; RCW 77.55.021; WAC 220-660-030; WAC 220-660-190; CCC 27.12; Washington Constitution, Article XI, section 11.

06Under the current code

For the 243043 Highway 101 drainage, Clallam County, not DNR, is the authority on stream typing under its existing code. DNR has said it has no authority there. The County keeps deferring to DNR's mapping anyway.

What the County's own code says (CCC Chapter 27.12, current through Ordinance 1042)

  • CCC 27.12.050: “The location and extent of critical areas shall be designated by Clallam County based upon best available information from qualified professional sources.” Map information “shall be advisory and used by the Administrator,” and critical areas “shall not include those lands where a qualified professional or qualified professional sources demonstrate to the satisfaction of the Administrator that maps or other information ... are in error.”
  • CCC 27.12.900(1): “‘Administrator’ means the Director of the Clallam County Department of Community Development or his/her designee.”
  • CCC 27.12.050(2): for fish and wildlife habitat, qualified professional sources include “published reports from State or federal agencies charged with management of fish and wildlife resources.” WDFW is that agency.
  • CCC 27.12.310(2): stream maps “shall be advisory and used by the Administrator and/or review authority to provide guidance in determining applicability of the standards to a property.”
  • CCC 27.12.900(84)(e): “Designation of Type 5 streams shall require review and confirmation by the Clallam County Habitat Specialist on a case-by-case basis.” The stream types in the current code are the County's own Type 1 through 5 waters.

What has happened instead

  • The County has used this authority before, on this same drainage. In 2014, under Harvest Plan FPA2014-00005, it wrote that “Clallam County has determined that this is a Type 4/5 stream as allowed per Section 27.12.050 CCC.”
  • For 243043 Highway 101, it has written that “The County has no mechanism to modify stream types,” and has referred the question to DNR.
  • DNR Forest Practices has said DNR has no authority over the parcel because it is non-forest land, outside DNR's water typing jurisdiction. (DNR Forest Practices, written reply to Third Harvest, October 20, 2026: “As we discussed, WA DNR Forest Practices does not have jurisdiction on non-forestland water type modifications.”)
  • WDFW itself has advised that on non-forested lands, DNR's water type modification forms are ones the County “would be responsible for initiating.”
  • The only fieldwork on record is the 2004 WDFW habitat survey; its report records no fish downstream of the US 101 culvert, past the crossing. It is a published report from the state fish and wildlife agency: the kind of best available science CCC 27.12.050 tells the County to weigh.

Third Harvest's position

Under existing code, the decision belongs to the County's Administrator. Instead of making its own determination, the County keeps deferring to DNR's Type F mapping. To Third Harvest's knowledge, no stream type modification has ever been initiated or issued for this reach, no written County determination has been made, and no fish survey is on record. The County should exercise the authority its own code gives it, weigh the 2004 WDFW record, and decide.

Sources: Clallam County Code, clallam.county.codes (sections linked above, retrieved October 17, 2026); Clallam County Harvest Plan FPA2014-00005; County correspondence of October 2026; WDFW written comments considered by the Planning Commission (County document 28462); WDFW Fish Passage and Diversion Screening Inventory, site 995540.

The state planning law

Critical areas and usable land (the Growth Management Act)

  • Critical areas: every county "shall adopt development regulations that protect critical areas" (RCW 36.70A.060(2)). These are wetlands, aquifer recharge areas, fish and wildlife habitat, frequently flooded areas, and geologic hazard areas (RCW 36.70A.030).
  • Best available science: counties "shall include the best available science" (RCW 36.70A.172(1)). Under the Commerce rule, best available science "is not the sole factor" (WAC 365-195-900(3)).
  • County maps: Clallam County's critical areas maps "are advisory only" (CCC 27.12.050).

Third Harvest's position is that Fish and Wildlife guidelines are followed once a stream is actually a stream: they apply after the water-typing question is settled, not before. Here, in Third Harvest's view, the record points the other way. WDFW's 2004 survey recorded no fish on its March 30, 2004 walk of about 656 ft downstream, past the crossing; the same crew rated the US 101 culvert a total barrier to fish, 0% passable; and the County's own 2014 written determination typed this drainage Type 4/5 (FPA 2014-00005).

“Best available science is ultimate truth-seeking.”
George Peterson, Third Harvest Inc.

Sources:

06The Constitution

“nor shall private property be taken for public use, without just compensation.”

Fifth Amendment, U.S. Constitution

“No private property shall be taken or damaged for public or private use without just compensation having been first made”

Washington Constitution, Article I, Section 16

An expansion of critical areas could be perceived as a taking in two ways: one while the owner waits, and one that never ends.

Temporary

Use frozen while the process runs

While permits, studies, reviews and moratorium-like delays run, the owner cannot use the land or the crossing. The Supreme Court has held that a temporary taking of all use must be compensated for the period it lasts, even if the government later backs off.

First English Evangelical Lutheran Church v. County of Los Angeles, 482 U.S. 304 (1987)

Long-term or permanent

Use removed by buffers and set-asides

Once adopted, wider buffers permanently take land out of use. A rule that leaves land with no economically beneficial use is a taking; a heavy partial loss is weighed by its economic impact on the owner and the owner's reasonable expectations.

Lucas v. South Carolina Coastal Council, 505 U.S. 1003 (1992); Penn Central Transportation Co. v. New York City, 438 U.S. 104 (1978)

It is Third Harvest's position that the County is exposing itself to legal liability: removing the use of private land without paying for it is a taking.

This is a plain-language illustration, not legal advice. Whether any specific restriction is a taking depends on facts a court would weigh. If you have questions about your own property, talk to a licensed Washington attorney.

08The Seven-Tier alternative

Type each water on the evidence for it, and tell the owner what would move it.

The October 13 draft would type waters with three state categories, F, Np and Ns, written for forest lands. In Third Harvest's view, that three-point system gives a drainage like this one no category of its own. Third Harvest put a Seven-Tier alternative in the hearing record, with drop-in code language, for the County to consider with DNR and WDFW before adopting Title 27. It is Third Harvest's proposal, not existing law.

  1. 1Artificial and stormwater conveyances. Ditches, field drainage and culverted runoff with no natural channel before construction. No stream type; managed under stormwater rules. Third Harvest places this parcel's channel here.
  2. 2Unverified, mapped-only channels. Lines from a model or map never checked in the field. Provisional, with no regulation until a field check places them.
  3. 3Non-fish seasonal. As proposed Type Ns: seasonal flow and no fish use, on field observation.
  4. 4Non-fish perennial. As proposed Type Np: year-round flow and no fish use, on field observation or survey.
  5. 5Fish-bearing above a documented total barrier. Resident fish only, upstream of a natural barrier a state agency has classed as total. Still fish-bearing, with buffers sized for resident trout.
  6. 6Fish-bearing, anadromous-accessible. Waters salmon and steelhead can reach. Full fish-bearing protections.
  7. 7Shorelines of the state and higher-order waters. As Type S. Regulated under the County's Shoreline Master Program (CCC 35), as the draft already provides.

Each tier states the evidence that places a water there and the evidence that would move it, so a landowner can see which tier applies and comply. The tiers separate what the current and proposed systems blur together: artificial from natural, field-verified from mapped, and resident from anadromous. Under the proposal, the County corrects its own mapping under CCC 27.12.050 before referring an owner to another agency.

09Why it matters to you

This is not one parcel's problem. The same lines run across the whole drainage.

The County's mapped stream lines cross hundreds of parcels near 243043 Highway 101. The frames below apply the current and draft buffer widths to those mapped lines. They are GIS estimates, not field findings, and they show how far a mapping question on one parcel reaches.

US 101 north to W Edgewood Drive with buffered channels
US 101 north to W Edgewood Drive. GIS estimate, 621-acre frame: about 49 acres at 60 feet, 121 at 150 feet and 188 at 240 feet (67 parcels touched at 150 feet). Wetlands shown with assumed draft buffers. Source: Clallam County GIS.
Half-mile frame around 243043 Highway 101
About half a mile across, including the parcels south of US 101. GIS estimate, 160-acre frame: about 13 acres at 60 feet, 34 at 150 feet and 53 at 240 feet (25 parcels touched at 150 feet). Wetlands shown with assumed draft buffers. Source: Clallam County GIS.
One-mile frame
About one mile across. GIS estimate, 640-acre frame: about 52 acres at 60 feet, 126 at 150 feet and 195 at 240 feet (66 parcels touched at 150 feet). Wetlands shown with assumed draft buffers. Source: Clallam County GIS.
Two-and-a-half-mile frame
About two and a half miles across. GIS estimate, 4,000-acre frame: about 410 acres at 60 feet, 953 at 150 feet and 1,435 at 240 feet (282 parcels touched at 150 feet). Wetlands shown with assumed draft buffers. Source: Clallam County GIS.
Stream and wetland buffers stacking
Where stream and wetland buffers stack, about one mile across. GIS estimate: stream buffers about 126 acres, wetlands with buffers about 68 acres, stacked about 15 acres, about 180 acres combined. Wetland buffers assumed at 110 feet (40 feet for Category IV). Source: Clallam County Wetlands layer; Oct 13 draft CCC 27.12.215.

“The steps that Third Harvest and other landowners can take right now, under the current code and in this hearing record, to correct the record are steps we will not be able to take effectively tomorrow if the update passes in its current form.”

Third Harvest, evidence letter for the October 27 hearing record

Third Harvest's position on the scope of the update

There should be no material expansion of critical areas at this time. The update should instead identify and fix the existing problems, such as those documented on this page, and the comprehensive plan should not pass without the critical areas update attached.

What it could cost one owner

One crossing, two sets of rules. Picture the same small farm road crossing on a small seasonal drainage, with the same culvert type in both cases. What changes is what the owner has to do to replace it.

Scenario A: today

Not fish-bearing

Like-for-like replacement of the same culvert type.

  • Replace the worn culvert like for like: the same type, the same size, in the same place.
  • Size it to carry the water. No fish passage design standard applies.
  • Little or no permitting beyond the basics.
  • No critical area report, no biologist and no engineer required for a simple swap.
  • Done in a dry-season work window, usually without long waits.

Scenario B: proposed rules

Presumed fish-bearing

The same culvert type under the October 13 draft.

  • The same culvert type, but sized to the state fish passage standard (stream simulation under WAC 220-660-190), which typically means a much larger structure set into the streambed.
  • A Hydraulic Project Approval (HPA) from WDFW, with in-water work limited to a seasonal window.
  • A critical area report on the stream and its buffer, prepared by a qualified professional.
  • A biologist to assess the stream, and an engineer to design the crossing.
  • An owner-paid restoration plan prepared by a qualified professional, required by draft 27.12.315(1)(c), with the sentence promising County technical help struck.
  • County review of the reports and plans, and possibly a variance before the Hearing Examiner if the buffer cannot be met.
  • Delay: studies, reviews and permit decisions run one after another before any work can start.
Real costs vary from site to site, and they grow sharply under Scenario B. Every item added on the right is paid for by the owner, before the crossing is built and before the land can be used.

Sources: WAC 220-660-190 (water crossing structures); WDFW Water Crossing Design Guidelines (2013); RCW 77.55.021 (HPA); October 13, 2026 draft Chapter 27.12, section 27.12.315(1)(c); Clallam County Fee Schedule 300-A (report review and variance).

Many residents in this county cannot afford engineered plans, habitat management plans and professional reports to answer requests like these.

10October 13 and 27, 2026

October 27, 2026 · Continued hearing

Public testimony on the comprehensive plan

On October 27, 2026, George Peterson spoke for Third Harvest to the Clallam County Board of Commissioners at the continued public hearing on the Clallam County Comprehensive Plan (agenda item 2c, ordinance and resolution regarding the Comprehensive Plan). Third Harvest's position: hold the plan until the critical areas ordinance is ready to go with it, built on field-verified creeks, with the County's duty to fix map errors kept in and a real cost-to-landowners analysis attached, and strike Policy 13.1.

“It's not the best available science. It's the best political science that we are applying to a lot of the issues that our county is facing.”

George Peterson, comprehensive plan hearing, October 27, 2026

Watch in the county recording at 2:50:21County meeting, CivicClerk event 4869Full meeting recording

Read the full comment (unofficial transcript, 2:50:21 to 2:54:40)

…Third Harvest, actually represent the company here today because we actually are a technology company and it's taken us the last several weeks for (unclear) comp plan and actually the publicly released critical areas draft that the planning department has released.

What I have found in this county, commissioners, is a bunch of really talented people trying to do their best. We all have different opinions. That's pretty clear today. But I do have a scientist, a PhD scientist in the room, and I want to respect that. What I've learned from my science teacher was observation, facts, data, (unclear). What I've learned in this county is that it's not the best available science. It's the best political science that we are applying to a lot of the issues that our county is facing.

I have given a 48-page report to every single one of you, including the administrator. I've yet to hear back from planning department or commissioners. So I'll go with my prepared (unclear). I'll start with number one.

In the October 14 draft of this plan, environmental justice appears 13 times. Overburdened appears five times. Policy 13.1 calls for environmental justice standards for overburdened communities applied to zoning and rezoning. Zoning decides what a family can build on their own land. Another policy that runs through a test of which groups count as overburdened. Not the soil, not the slope. Not the water. A label. The rules should be the same for the logger out in Forks, the farmer and Dungeness, the tribal member on the Elwha, and the retirees in Port Angeles.

Here's what's happening today. You're setting aside the critical areas ordinance aside and adopting this plan now, but this plan carries a critical areas assessment inside of it. Adopt it, and you tell the planning department the basis of the draft is fine. It's not.

Under the new rules, I bet the cost of replacement culvert at roughly 13 times what it costs today. 13 times. A crossing on a small farm road that used to run a few thousand dollars, the state's own figure for private land now averages 185,000. Those costs are real. I'm not saying that they're not. Rural families cannot afford to repair anything on a creek the county calls fish bearing. When a family loses the use of its land and keeps paying taxes on it, that's a taking. I believe this is unconstitutional and temporary taking today and for the record, a permanent taking tomorrow.

The critical areas mandate is about salmon and steelhead, yet any fish at all gets treated like salmon and steelhead without a professional ever walking the creek. These calls come from maps with known errors. The way I read the RCWs, those maps are advisory only. Under the current code, the county has responsibility to fix those errors. The new draft closes the loop and leaves the landowner holding the bill. In practice, the county already treats that draft as policy. Adopting this plan today makes it official. These two documents decide together what land can be used. Adopt one now, and you vote on the vision today and hand the landowners the bill later. We're not representing our whole community in this draft, and it sets a dangerous precedent.

So here's my answer. Don't adopt this plan today. Hold it until a critical areas ordinance is ready to go with it, build on field verified creeks, with the county's duty to fix errors kept in and a real cost to landowners analysis attached, and strike Policy 13.1. Thank you.

Unofficial transcript, machine-transcribed from the county meeting recording and lightly punctuated; it may contain errors, and the recording controls. Timestamps are video time. Words that could not be made out are marked (unclear). Official minutes for October 27 had not been posted when this was published; the recording is the record.

October 13, 2026

On October 13, 2026, George Peterson spoke to the Clallam County Board of Commissioners during the comprehensive plan hearing.

In his view, the critical areas update has not yet been released for public review. He told the board that adopting the comprehensive plan with the climate element first means the critical areas rules get built on top of it, so the public never gets a clean look at the rules that touch their land. To show where those rules could go, he pointed to Jefferson County, which he said had raised its fish-bearing buffer from 150 to 200 feet.

“That's not a one-time fix. That's a ratchet. Nobody has shown this board proof that any of it works.”

George Peterson, comprehensive plan hearing
Excerpted from the county meeting recording; the full meeting is linked below.Clallam County Board of Commissioners, October 13, 2026. Source: county meeting recording.Full meeting recording

His three questions to the board

  1. 1Will the board release the critical areas update for public review before adopting the comprehensive plan?
  2. 2Will it require monitoring data before expanding buffers further?
  3. 3Will it tell Futurewise that Clallam County code is written for Clallam County residents?

The board continued the hearing to October 27, 2026.

Hear the questions

0:00 / 0:16

“So my question: will this board release the critical areas update for the public review before the adopting the comp plan? Will you require monitoring data before expanding buffers further? And will you tell Futurewise that Clallam County code is written for Clallam County residents…”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 1:18:49 of the county meeting recording.

Transcript excerpts are from the meeting audio.

Public comment, October 13

Three residents spoke at the October 13 comprehensive plan hearing and public comment. Read together with Third Harvest's own documented case, they describe, in Third Harvest's view, one pattern every Clallam County landowner should see.

In Third Harvest's view, three things are moving at once.

  1. 1An aggressive critical areas assessment attached to the comprehensive plan, which the County may be obligated to adopt, or may simply absorb.
  2. 2Running in parallel, the Department of Community Development's own Title 27 draft, which expands critical areas and, Third Harvest believes, undercuts the highest and best use of private land.
  3. 3Consulting groups that take part in meetings and public comment while, in Third Harvest's view, their real agenda is litigation and pushing a worldview action plan. Third Harvest calls it two-faced politics, and believes it needs exposing.

Third Harvest

243043 Highway 101

Third Harvest's case is documented. In 2004 a WDFW crew rated the US 101 culvert just upstream of 243043 Highway 101 a total barrier to fish, 0% passable. On March 30, 2004 the crew walked about 656 ft downstream, past the crossing; the 2004 report records no fish.

The County's own records type that one drainage three ways: Type 3 on the County map; Type 4/5 in the County's 2014 written determination for the reach just upstream (FPA2014-00005); and Type F in DNR's 2014 forest practices file. The roughly 0.9 mile of channel from the end of that walk to W Edgewood Drive has never been surveyed or typed in the field.

The October 13 draft of Title 27 strikes the requirement that the County Habitat Specialist confirm a Type 5 stream case by case (27.12.900(84)(e)). It strikes the code's own sentence recognizing that applying the chapter could amount to a taking (27.12.740). It strikes the County's offer of restoration help (27.12.315(1)(c)). And it adds a certificate of compliance for any change to a culvert (27.12.035(8)).

On climate, there is no county “Climate Resiliency Act” on record. The state law is HB 1181 (2023), now RCW 36.70A.070(9), which makes a climate resiliency subelement mandatory. The County's climate element is still proposed, and its draft says Clallam County “has exceeded the minimum requirements of HB 1181.” In Third Harvest's view, going past the state minimum on climate while stripping the protections above leaves every landowner on a mapped stream exposed.

Jeff Tozzer

Sequim

Tozzer told the board that a February 5, 2024 work-session presentation “lasted 30 minutes, and it was given by the Cascadia Consulting Group,” and that two commissioners “fast-tracked that contract for approval to the very next day.”

“It was a $370,000 contract,” he said.unverified He told the board that when John Worthington asked about it six months later, “you denied that you'd ever entered into the contract with Cascadia.”unverified

“rather than Clallam County joining ICLEI, you hired the consultant that did.”

Jeff Tozzer, Sequim, to the Board of Commissioners

He warned that the plan opens the county “to the risk of lawsuits by activist law firms like FutureWise.”

Hear Jeff Tozzer, October 13

0:00 / 0:36

“It was a $370,000 contract. And six months later. When citizen John Worthington asked you about it, you denied that you'd ever entered into the contract with Cascadia. Cascadia Consulting Group is a member of the ICLEI. They use their software. They've crafted our comprehensive plan using that software. So, Commissioner [Ozias], you found a workaround. It took a few years, but rather than Clallam County joining ICLEI, you hired the consultant that did.”

Jeff Tozzer, Clallam County Board of Commissioners, October 13, 2026, at 1:43:10 of the county meeting recording.
Jeff Tozzer, public testimony, Clallam County Board of Commissioners, October 13, 2026, at 1:43:10 to 1:43:47 in the county meeting recording (36.6 s excerpt). “[Ozias]” is an editorial correction of a machine-transcribed name.

John Worthington

Sequim

“The county outsourced its long-range planning to a paid sub-agency meta-association”

John Worthington, Sequim, to the Board of Commissioners

He named the NODC and the Puget Sound Partnership among its members.

“The county paid the EDC $232,000 to conduct DEI land use tracking at the NODC,” he said.unverified “Cascadia got $369,000 to do DEI work.”unverified

He also told the board that FutureWise “actively bragged about getting the State Department of Commerce grant to work for the tribes.”unverified

Ed Bowen

Clallam Bay

Bowen put this on the record: “Department of Commerce guidelines. This is not WAC. This is not RCW.”

He told the board that none of his testimony on the comprehensive plan has “been adequately or even addressed by the DCD director,” and asked, “When is the county road system and WSDOT interaction going to be addressed in this plan?”

“We are giving away our western side of the county to our eastern interest.”

Ed Bowen, Clallam Bay, to the Board of Commissioners

“You're giving up our industrial opportunity,” he said. In general comment he raised Cascadia Consulting, which he believes is the plan's consultant: “There may actually be a conflict of interest,” he said, “especially in regards to how the Department of Commerce guide is created.”

The consultants in the room

The pattern Third Harvest describes is on the record. FutureWise staff attorney Brooke Frickleton told the County in September that its climate element is written with “many aspirational words like promote, encourage, explore” (Peninsula Daily News, Sept. 30, 2026). Tozzer counted FutureWise among the “activist law firms.” Worthington named its Commerce grant. In Third Harvest's view, the same groups that ask for stronger words at the microphone are the ones positioned to sue when those words become law.

Who is accountable

Bruce Emery is Clallam County's Director of Community Development. His department is presenting the comprehensive plan update and is writing the Title 27 critical areas update. It is Third Harvest's assessment that under the plan Emery is proposing, tremendous land loss is coming under his leadership, even before any lawsuit is filed.

Neighbors, beware. The hearing continues Tuesday, October 27, 2026, at 10:30 a.m.

From public comment at the October 13, 2026 Clallam County Board of Commissioners meeting. Quotes are from a machine transcript of the public recording and have not yet been checked against official minutes or county records. Dollar figures and the denial claim are the speakers' own and are marked unverified while a records check is under way. Speakers' views are their own. County meeting, CivicClerk event 4867 · Full meeting recording

Third Harvest's position

Predetermination Theory

The County pointed Third Harvest to DNR for a stream type modification decision. DNR Forest Practices replied in writing on October 20, 2026: “As we discussed, WA DNR Forest Practices does not have jurisdiction on non-forestland water type modifications.”

Third Harvest filed the application the County asked for anyway, on October 20, 2026.

The referral comes back empty. The County's own process points in a circle.

Read the Pontius Pilate Theory →

Sources: DNR Forest Practices, Olympic Region, written reply to Third Harvest, October 20, 2026; Third Harvest's Non-Forest Land Water Type Modification application, filed October 20, 2026.

11What you can do

Before October 27, and after.

Key dates

October 13, 2026
Date of the County's draft of Chapter 27.12, Critical Areas. Comprehensive plan hearing before the Board of Commissioners; the board continued the hearing.
October 19, 2026
WDFW's reply on the crossing. Third Harvest sent its evidence for the hearing record.
October 20, 2026
Draft minutes of the October 13 hearing posted for approval. Third Harvest amended its requests (Request 8, the proposed names) and stated its position on permit applications.
October 27, 2026, 10:30 a.m.
Continued public hearing before the Board of Commissioners.

On the record: the sequencing problem

0:00 / 0:11

“That means that the climate assessment becomes the foundation of the critical areas rule gets built on, and the public gets no clean shot at regulations that actually touch their land.”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 1:17:02 of the county meeting recording.

On the record: who gets to see it

0:00 / 0:22

“I go to Bruce, I'm like, Bruce, hey, you wanna tell me where we're headed with this critical areas expansion? I hear it's gonna be expanded. I'm not allowed to know anything. But these other outside agencies that the county's contracted are, and we don't even have that attached to the existing comprehensive plan so our constituents can actually review it.”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 3:09:50 of the county meeting recording.
ShareXFacebook

Something better than a taking

The County already has the code and the authority to fix this administratively. CCC 27.12.050 lets the Administrator correct a map error. CCC 27.12.040 lets a lawfully established use continue. The County has used those tools before, on this same drainage. So far it won't use them here.

Let's work together on something better than a taking: a clear, written process for documenting historical use, deciding stream type on non-forest land, and correcting a map that does not match the ground. That would serve every landowner in this county.

Later in the same meeting, during general public comment, he asked the board to reconsider the climate assessment the critical areas rules would rest on.

On the record: a legacy

0:00 / 0:24

“I think the best thing to probably do with this climate assessment is to walk it back. Mike, Randy, it's disastrous. Let me extend the legacy comment that I made a couple of weeks ago to Bruce, to the whole board here. Your legacy on this climate assessment is attached to it. It will destroy some of the work that you've actually done, the good work that you've done.”

George Peterson, Clallam County Board of Commissioners, October 13, 2026, at 3:08:32 of the county meeting recording.

This page is Third Harvest's account of the public record and is not legal advice. If you have questions about your own property, talk to a licensed Washington attorney.